Application of the goal programming in wood processing production planning
Piljević, Ajla (2026)
Diplomityö
Piljević, Ajla
2026
School of Engineering Science, Kemiantekniikka
Kaikki oikeudet pidätetään.
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi-fe20261026137342
https://urn.fi/URN:NBN:fi-fe20261026137342
Tiivistelmä
Wood-processing companies often try to achieve multiple conflicting goals simultaneously during production planning. In this thesis, two mixed-integer lexicographic goal programming models were developed to demonstrate the applicability and benefits of using goal programming as an optimisation tool to help with production planning. The models were formulated using data provided by the chair manufacturer Wood Team d.o.o. for three selected chair models and three production departments: machining, upholstery and assembly. Both models included the same goals but assigned them different priority orders. These goals were to reach a target profit, keep CO₂ emission costs within an acceptable level, reduce underproduction relative to average daily demand, and minimise underutilised labour capacity and overtime. Microsoft Excel Solver was used to solve the models with a sequential lexicographic procedure. The results showed that different priority orders led to different production plans and outcomes regarding labour utilisation, overtime and demand fulfilment, highlighting the importance of carefully assigning priorities. The findings indicate that goal programming, with its ability to consider multiple conflicting goals, can support production planning. Goal programming has many variants, and the models are flexible, allowing them to be further adapted and developed when necessary. Consequently, goal programming can serve as a useful decision-support tool for testing the potential effects of managerial decisions before their implementation
